SECTION 2 - PROCEDURES

3120765

– JLG Lift –

2-45

2.24 JLG CONTROL SYSTEM ANALYZER KIT

INSTRUCTIONS

Introduction

WHEN INSTALLING A NEW POWER MODULE CONTROLLER ON
THE MACHINE, IT WILL BE NECESSARY TO PROGRAM THE CON-
TROLLER FOR THE PROPER MACHINE CONFIGURATION,
INCLUDING OPTIONS.

IT IS A GOOD PRACTICE TO AVOID PRESSURE-WASHING ELEC-
TRICAL/ELECTRONIC COMPONENTS. SHOULD PRESSURE-
WASHING BE UTILIZED TO WASH AREAS CONTAINING ELECTRI-
CAL/ELECTRONIC COMPONENTS, JLG INDUSTRIES, INC. REC-
OMMENDS A MAXIMUM PRESSURE OF 750 PSI (52 BAR) AT A

MINIMUM DISTANCE OF 12 INCHES (30.5 CM) AWAY FROM THESE
COMPONENTS. IF ELECTRICAL/ELECTRONIC COMPONENTS
ARE SPRAYED, SPRAYING MUST NOT BE DIRECT AND BE FOR
BRIEF TIME PERIODS TO AVOID HEAVY SATURATION.

The JLG designed Control System is a 48 volt based
motor control unit installed on the boom lift.

The JLG Control System has reduced the need for
exposed terminal strips, diodes and trimpots and provides
simplicity in viewing and adjusting the various personality
settings for smooth control of: acceleration, deceleration,
creep and max.-speed for all boom, drive, and steering
functions.

Figure 2-45. Control Module Location