Assembly

NOTE: When installing fly section wear pads, install same

number and thickness of shims as were removed
during disassembly.

1. Measure inside dimensions of the base section to

determine the number of shims required for proper
lift.

2. Install side, top and bottom wear pads to the aft end

of fly section; shim evenly to the measurements of
the inside of base boom section.

WHEN ASSEMBLING BOOM SECTIONS, ENSURE THAT THE BOOM
SLIDING TRAJECTORIES HAVE BEEN CLEARED OF CHAINS,
TOOLS, AND OTHER OBSTRUCTIONS.

3. Secure the sling and lifting device at the telescope

cylinder’s approximate center of gravity, and lift the
cylinder to the aft end of the fly boom section.

4. Slide telescope cylinder into the aft end of fly boom

section. Align attachment holes in fly boom section
with hole in rod end of telescope cylinder.

5. Install telescope cylinder pin and secure with mount-

ing hardware.

6. Secure the sling and lifting device at the fly boom

assembly approximate center of gravity.

7. Slide fly boom assembly into the base boom sec-

tion. Shim boom, if necessary, for a total of 1/16 inch
(0.062) clearance.

8. Install wear pads into the forward position of the

base boom section. Shim boom, if necessary, for a
total of 2/10 inch (0.20) clearance.

9. Align the cylinder with the slots at aft end of base

boom section, then secure cylinder with mounting
hardware.

Installation

1. Using a suitable lifting device, position boom

assembly on turntable so that the pivot holes in both
boom and turntable are aligned.

2. Install boom pivot pin, ensuring that location of hole

in pin is aligned with attach point on turntable.

3. If necessary, gently tap pin into position with soft

headed mallet. Secure pin mounting hardware.

4. Connect all wiring connectors to the correct connec-

tors.

5. Connect all hydraulic lines running along side of

boom assembly.

6. Using all applicable safety precautions, operate lift-

ing device in order to position boom lift cylinder so
that holes in the cylinder rod end and boom struc-
ture are aligned. Insert the lift cylinder pin, ensuring
that location of hole in pin is aligned with attach
point on boom.

7. Align holes in boom structure with hole in master

cylinder. Insert the master cylinder pin, ensuring that
location of hole in pin is aligned with attach point on
boom.

8. Using all applicable safety precautions, operate

machine systems and raise and extend boom fully,
noting the performance of the extension cycle.

9. Retract and lower boom, noting the performance of

the retraction cycle.