10 foot switch adjustment, 11 boom synchronizing procedure, Foot switch adjustment -33 – JLG 600A_AJ Service Manual User Manual

Page 209: Boom synchronizing procedure -33, Platform support torque values -33

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121201

– JLG Lift –

4-33

4.10 FOOT SWITCH ADJUSTMENT

Adjust so that functions will operate when pedal is at cen-
ter of travel. If switch operates within last 1/4 in. (6.35 mm)
of travel, top or bottom, it should be adjusted.

4.11 BOOM SYNCHRONIZING PROCEDURE

NOTE: If the Lower Boom assembly does not fully lower:

1. Remove all personnel from the platform.

2. Pull the red knob located under the manual descent

control valve.

3. From Ground Control, activate the lift control switch,

raise Lower Boom 6 feet (1.83m).

4. After raising Lower Boom, release the red knob.

5. Activate Lower Boom Down, fully lower boom.

6. Repeat step 1 thru 5 if necessary.

A,B,D

C,D

E

A
B
C
D
E

Torque to 50 ft.lbs. (68 Nm)
Loctite #242
Torque to 480 ft. lbs. (650 Nm)
Check torque every 150 hours of operation
Torque to 85 ft. lbs. (115 Nm)

Figure 4-23. Platform Support Torque Values

NOTE: If any rotator bolts are replaced, all bolts

on the rotator should be retorqued.

Advertising