Main boom lift cylinder removal, Main boom lift cylinder removal -11 – JLG 600A_AJ Service Manual User Manual

Page 221

Advertising
background image

SECTION 5 - HYDRAULICS

3121201

– JLG Lift –

5-11

6. Carefully install the telescope cylinder barrel end

support into slots in base boom and secure with
blocks and bolts. Use Loctite #242 on bolts. Shim
as necessary.

7. Remove applicable hydraulic line and port caps and

correctly connect the hydraulic lines to the tele-
scope cylinder. Ensure all hoses are correctly
routed.

8. Remove boom prop and overhead crane. Activate

hydraulic system.

9. Using all applicable safety precautions, operate the

boom functions. Check for correct operation and
hydraulic leaks. Secure as necessary.

10. Check fluid level of hydraulic tank and adjust as nec-

essary.

Main Boom Lift Cylinder Removal

1. Place the machine on a flat and level surface. Start

the engine and place the main boom in the horizon-
tal position. Shut down engine and prop the boom.
(See Figure 5-17., Boom Positioning and Support,
Cylinder Repair.

2. Remove the hardware retaining the cylinder rod

attach pin #2 to the boom. Using a suitable brass
drift, drive out the cylinder rod attach pin.

3. Using auxiliary power, retract the lift cylinder rod

completely.

4. Disconnect, cap and tag the main boom lift cylinder

hydraulic lines and ports.

5. Remove barrel end attach pin #3 retaining hard-

ware. Using a suitable brass drift drive out the barrel
end attach pin from the upright.

6. Remove the cylinder from the boom and place in a

suitable work area.

Figure 5-14. Location of Components - Telescope and Lift Cylinder