JLG 601S ANSI Service Manual User Manual

Page 45

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120746

– JLG Lift –

3-5

6. Place bearing shim (8) over end of spindle and

against bearing cone.

EYE PROTECTION SHOULD BE WORN DURING RETAINING RING
INSTALLATION.

7. Install new retaining ring (9) completely into spindle

groove and against bearing shim. Ensure retaining
ring is entirely in groove.

8. Place internal gear (12) onto end of spindle.

9. Install thrust washers and thrust bearing (39, 40) on

the portion of the spindle which extends into the
internal gear.

10. Install retaining ring (34) into input shaft retaining

ring groove.

11. Place input shaft assembly (35) into spindle bore

with unsplined end facing out.

Advertising