Assembly notes, Taper roller bearing initial tension – JLG 601S ANSI Service Manual User Manual

Page 63

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120746

– JLG Lift –

3-23

Assembly Notes

1. Measurement of the taper roller bearing pretension.

2. Note that there is a correct connection of the piston

rod and the swash plate.

3. Pumps clockwise driven must have a position to the

valve plate 4 degrees out of center in the same
direction de-centered like drive direction. (Note
spare parts exist as cw and ccw valve plates.)

4. Pumps counterclockwise driven must have a posi-

tion of the valve plate 4 degrees de-centered in ccw
position.

5. Assembly of the port plate and the pump housing:

Note the correct position of the drilling that connects
high pressure to the control valve. Check control
valve drill position at the pump housing and fit
together.

Taper Roller Bearing Initial Tension

Cast iron pump housing must have initial tension of the
bearings: 0........0,05 mm, grind Pos. 12 if necessary.

Advertising