Required tools, Required tools -13 – JLG M600 Service Manual User Manual

Page 123

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121813

– JLG Lift –

4-13

Required Tools

Upon assembly and disassembly of the actuator there are
basic tools required. The tools and their intended func-
tions are as follows:

1. Flashlight - helps examine timing marks, component

failure and overall condition.

2. Felt Marker - match mark the timing marks and out-

line troubled areas.

3. Allen wrench - removal of port plugs and set screws.

4. Box knife - removal of seals.

5. Seal tool - assembly and disassembly of seals and

wear guides.

6. Pry bar - removal of end cap and manual rotation of

shaft.

7. Rubber mallet- removal and installation of shaft and

piston sleeve assembly.

8. Nylon drift - installation of piston sleeve

9. End cap dowel pins - removal and installation of end

cap (sold with Helac seal kit).

The seal tool is merely a customized standard flat head
screwdriver. To make this tool you will need to heat the flat
end with a torch. Secure the heated end of the screwdriver
in a vice and physically bend the heated end to a slight
radius. Once the radius is achieved round off all sharp
edges of the heated end by using a grinder. There may be
some slight modifications for your own personal prefer-
ence.

Advertising
This manual is related to the following products: