JLG M600 Service Manual User Manual

Page 109

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121813

– JLG Lift –

3-71

conductors of the harness.

5. Cut wire 106 going to the Engine/Generator Control-

ler after the existing connection point and install the
conductors that lead to the new inline fuse holder.
Use insulated butt splice connectors for these con-
ductors.

6. Re-install the harness with the new fuse in place.

7. Reconnect the lift and APU start battery. The APU is

now ready for use.

Advertising
This manual is related to the following products: