Mounting – mechanical installation 2.2, Warning – 2N Helios IP User manual, 1510 v1.12 User Manual

Page 23

Advertising
background image

Mounting

– Mechanical Installation

2.2

23

Figure 2.2 Cover Removing

Figure 2.3 Plastic Cover Removing

Figure 2.4 Multiple-Module Assembly

Warning

Never remove the main board or camera electronics from under the lower
cover while installing 2N

®

Helios IP. Do not disconnect the camera flat

cable from the main board. Do not bend and press upon the flat cable
either.

4. In multiple-module assemblies connect the boxes according to

Figure 2.4, placing the basic module to the left and the extending modules to
the right. The interconnecting cable shall be connected later!

5. Install blank modules on the unused side holes as shown in Figure 2.4.

6. If you are installing a roof module, put it on the wall now.

7. Fix 2N

®

Helios IP on the wall with screws as shown in Figure 2.6. Carry the

supply cables (Ethernet, lock, power cables) to the basic module box through
one of the holes.

Warning

Make sure that the mounting surface for the 2N

®

Helios IP door

communicator is perfectly flat. Avoid mechanical overload upon the
bottom part of the cover. An incorrect installation on an uneven surface
may lead to cover deformation and thus product malfunctions.

Advertising