3.9 Order of installation

Information:

The connection to the power supply network is established via the included
power cable or lead-through terminal with screw connection. No earthing
connection needs to be established as earthing takes place via the protective
earth of the device plug / power supply connection. In the event of additional
earthing on the earthing screw, use wire cross section with at least 2.5 mm².

1)

Cut out recess in the switch board or switching cabinet door according to the installation layout.

The fixing screws for the tensioners must be screwed in.
The screws can be unscrewed with a size TX8 screwdriver.

2)

The device is placed in the created recess. The tensioners snap back.