4.2 Cable installation

The interfaces and the device power supply plug are located in the service slot of the device.

4.3 Order of steps during commissioning

•24V DC device: insert cable for power supply with cable end sleeves into terminals
•Connect cable for serial / parallel data transmission and fasten the plugs to the sockets
•Plug in all other required cables and secure against slipping out.

Pos : 19 /D atent ec hni k/I nbetri ebnahme/ Betriebsberei tschaf t prüf en/ Betriebsbereit schaf t prüf en f ür O PC/C PC/ PLC /OTC /ITC/ VMT-Serie(+Monit ore) / I PC 5100/ 5500/ 2400/1100 @ 0\ mod_1158905578361_6. doc @ 381 @

4.4 Check for operational readiness

Check the device for hidden damages caused by improper transport, incorrect operation/storage
conditions or improper use (e.g., smoke emissions from the device, etc.). If damages are found,
immediately shut down the device and protect it against unintentional startup.