APG FLR Series user manual User Manual

Page 21

Advertising
background image

Rev. A5, 10/09

FLR Series

21

Automation Products Group, Inc.

APG...Providing tailored solutions for measurement applications

Tel: 1/888/525-7300 • Fax: 1/435/753-7490 • www.apgsensors.com • [email protected]

11. Slide the reed switch along the rod until the center lines up with the mark
you make on the rod in step 9. Re-secure the wires to the center rod with
electrical tape.

12. Carefully reinsert the reed switch assembly into the stem and test the switch
action.

13. If the actuation point needs fine tuning, remove the reed assembly from the
stem and make any necessary adjustments to the reed switch position.

14. Reassemble the unit.

Advertising