8 taking out of service, Shutting down the leak detector, Disposing of the mass spectrometer module – INFICON LDS3000 Modular Leak Detector User Manual

Page 49: Returning the mass spectrometer module, 8taking out of service, 1 shutting down the leak detector, 2 disposing of the mass spectrometer module, 3 returning the mass spectrometer module

Advertising
background image

Taking out of service

49

8

Taking out of service

8.1

Shutting down the leak detector

1

Switch off the leak detector on the power supply pack.

2

Wait until the turbo molecular pump has stopped running.

8.2

Disposing of the mass spectrometer module

The unit can be disposed of by the user or sent to INFICON.

Information The unit is made of materials that can be reused. By recycling these

materials you reduce waste and environmental impact.

► For disposal, always comply with local and regional environmental and safety

regulations.

8.3

Returning the mass spectrometer module

1

Fill out the "Declaration of Contamination".

Information We will be happy to send you the form “Declaration of Contamination”

upon request. Xerox copies of the form are permissible.

The Declaration of Conformity is essential to ensure compliance with statutory
requirements and the protection of our employees. Units submitted without an
enclosed Declaration of Conformity will be returned to the sender by INFICON.

2

Attach the form to the unit or enclose it in the unit's packaging.

Danger to health

Contaminated units can damage the health of INFICON's service staff.
► Use the Declaration of Contamination.

Advertising