07

4-

39

8-

P1A

Crystal12 Sensor Operating Manual

6

Add the air fitting to the tube which has the female thread adapter installed.

7

Connect 1/8" diameter tubing from the valve output (A) to the feedthrough
fitting.

CAUTION

Use of more than 80" (2 meters) of 1/8" tubing between
the valve with the orifice and the bellows may cause a
switcher failure because of the time required to bleed out
sufficient air during de-pressurization. If tubing greater
than 1/8" in diameter is used, the maximum length must
be reduced proportional to the additional volume.

8

Attach the valve’s supply (normally closed (NC) port) to the 80-90 PSIG (5.5 bar
- 6.2 bar) [550 kPa - 620 kPa] source of air. Verify that the orifice (IPN 059-189)
has been installed into this NC valve port. (See Figure 3-1b of

Figure 3-1 on

page 3-3

.)

3.2 Installation with 2 3/4” Feedthrough

Installation of the solenoid valve requires a 2 3/4" feedthrough inclusive of two
coaxial feedthroughs (IPN 002-080, see

Figure 5-2 on page 5-2

). The second

coaxial feedthrough is not used, and should be protected from damage as a result
of process material. Follow the steps below:

1

Install the Feedthrough.

2

Add the valve bracket (modified) to the desired location as illustrated in

Figure

3-3 on page 3-5

.

3

Tighten the feedthrough bolts.

4

Install the air fitting to the female thread adapter.

5

Connect 1/8" diameter tubing from the valve output (A) to the feedthrough
fitting. See the CAUTION in

section 3.1

above.

6

Attach the valve’s supply (P) (normally closed (NC) port) to the 80-90 PSIG (5.5
bar - 6.2 bar) [550 kPa - 620 kPa] source of air. Verify that the orifice (IPN
059-189) has been installed into this NC valve port. (See Figure 3-1b of

Figure

3-1 on page 3-3

.)

NOTE: Maximum temperature for the solenoid valve assembly is 105 °C for

bakeout and operation.