4 operation – INFICON Edge CDG045D2 1 … 1000Torr / mbar User Manual
Page 22
Advertising
22
tina86e1 (2013-11)
4 Operation
Put the gauge into operation. If you are using an INFICON con-
troller, define the measurement range (
→
[1], [2], [3]).
A warm-up time of at least 90 minutes should be allowed; for
precise pressure measurements a warm-up time of at least
3 hours is required.
If the gauge is used for fast downstream pressure con-
trol we recommend setting its signal filter to "fast".
The filter can be set via the RS232C interface or the
diagnostic port (
→ [4]).
DANGER
DANGER: hot surface (CDG100D2 only and at
operation temperatures >40°C)
Touching the hot surface (>65 °C) can cause
burns.
Don't touch the hot surface or wear protective
gloves.
Advertising
This manual is related to the following products: