Startup, 1 installation site requirements, 2 unpacking – Leica Biosystems LN22 User Manual
Page 18: Installation site requirements, Unpacking
18
Instructions for Use V1.2, RevB – 10/2012
4.1 Installation site requirements
-
stable, vibration-free laboratory bench with horizontal and even stage
plate; practically vibration-free floor
-
no direct insulation
-
mains power supply within a range of approx. 1.5 meters
-
no draft
-
plain floor surface
-
handwheel easily and comfortably accessible
-
10 cm minimum distance between the instrument and walls and/or
other objects on all sides
The room must be well ventilated and large enough to avoid a dan-
gerous decrease of the oxygen level in the air.
Carefully read the chapter on ‘Safety Instructions’!
4.2 Unpacking
The shipment consists of several cardboard boxes, which are all con-
tained in one large box.
•
Remove all packing material carefully.
If you find any damages, please contact your freight forwarder immedi-
ately.
4.
Startup