Startup, 1 installation site requirements, 2 unpacking – Leica Biosystems LN22 User Manual

Page 18: Installation site requirements, Unpacking

Advertising
background image

18

Instructions for Use V1.2, RevB – 10/2012

4.1 Installation site requirements

-

stable, vibration-free laboratory bench with horizontal and even stage
plate; practically vibration-free floor

-

no direct insulation

-

mains power supply within a range of approx. 1.5 meters

-

no draft

-

plain floor surface

-

handwheel easily and comfortably accessible

-

10 cm minimum distance between the instrument and walls and/or
other objects on all sides

The room must be well ventilated and large enough to avoid a dan-
gerous decrease of the oxygen level in the air.

Carefully read the chapter on ‘Safety Instructions’!

4.2 Unpacking

The shipment consists of several cardboard boxes, which are all con-
tained in one large box.

Remove all packing material carefully.

If you find any damages, please contact your freight forwarder immedi-
ately.

4.

Startup

Advertising