Setting up the instrument – Leica Biosystems ST4020 User Manual
Page 21
Advertising
21
Leica ST4020
4.
Setting up the instrument
Installing the Rinsing Water Containers
(continued)
Hose 1
Hose 2
Hose 3
Area of the
drainage tank
Fig. 23
Fig. 22
shows how the hoses
are routed in the instrument.
If you want to work entirely
without water, no further steps
are necessary – simply do not
connect a water supply line to
the instrument.
Place the rinsing water con-
tainers (6) in the desired posi-
tion on the platform. The rinse
container bar fitting pointed (5)
to the exit tank (refer to
fig. 23
).
Start with the station closest to
the drainage tank.
Fig. 22
Fig. 24
6
Marking 1
The hose (15) should run level
along the bottom of the instru-
ment.
Mark the end of the hose that
will connect to the rinsing
water container.
This is "Marking 1".
15
5
Advertising