1 power connections, 3 holding brake dc 24 v (optional), Power connections – Lenze MDFQA Operating Instructions User Manual

Page 33: Holding brake dc 24 v (optional), Electrical installation, Terminal box cable glands for the fan terminal box, En 33, Cable glands for the fan terminal box

Advertising
background image

Electrical installation

Terminal box

Cable glands for the fan terminal box

6

EN

33

Lenze ¯ BA 33.0006 ¯ 3.0

Cable glands for the fan terminal box

Motor type/size

Screwed connection

MCA/MQA

20

1 x M 16 x 1.5

22
26

6.4.1

Power connections

MCA; MCS, MQA 20...22, MD

LKS, SDSGA, SDSGS

Terminal

Standard description

Meaning

+

PE

PE conductor

U
V
W

U
V
W

Motor winding phase U
Motor winding phase V
Motor winding phase W

TP1
TP2

TP1
TP2

PTC thermistor

TB1
TB2

TB1
TB2

Thermostat
Thermal NC contact

MCA 26, MQA 26, MDFQA 160
Terminal

Standard description

Meaning

+

PE

PE conductor

1
2
3

U1
V1
W1

Start of winding phase U
Start of winding phase V
Start of winding phase W

4
5
6

W2
U2
V2

End of winding phase W
End of winding phase U
End of winding phase V

Star connection

Delta connection

L1 L2 L3

PE

(W1)

(U1) (V1)

(W2) (U2) (V2)

1

2

3

4

5

6

L1 L2 L3

PE

(W1)

(U1) (V1)

(W2) (U2) (V2)

1

2

3

4

5

6

6.4.2

Holding brake DC 205 V − connected via rectifier (optionl)

Terminal

Standard description

Meaning

~

BA1

Connection to L1 −
mains

AC−excited brake (rectifier)

~

BA2

Connection to N −
mains

M

3~

L1 N

+

BD1 (factory−set wiring)

Connection of
holding brake +

BD2 (factory−set wiring)

Connection of
holding brake −

Switching contact, DC switching

6.4.3

Holding brake DC 24 V (optional)

Terminal

Standard description

Meaning

BD1
BD2

BD1
BD2

Holding brake +
Holding brake −

Advertising