Commissioning and operation

Important notes

8

EN

37

Lenze ¯ BA 33.0006 ¯ 3.0

8

Commissioning and operation

8.1

Important notes

For trial run without output elements, lock the featherkey. Do not deactivate the
protective devices, not even in a trial run.

Check the correct operation of the brake before commissioning motors with brakes.

8.2

Before switching on

)

Note!

Before switch−on, you must ensure that the motor starts with the
intended direction of rotation.
Lenze motors rotate CW (looking at the driven shaft) if a clockwise
three−phase field L1

W U1, L2 WV1, L3 W W1 is applied.

Before initial commissioning, before commissioning after an extended standstill
period, or before commissioning after an overhaul of the motor, the following must be
checked:

¯

Measure the insulation resistance, in case of values

£1 kWper volt of rated

voltage, dry the winding.

¯

Have all screwed connections of the mechanical and electrical parts been firmly
tightened?

¯

Is the unrestricted supply and removal of cooling air ensured?

¯

Has the PE conductor been connected correctly?

¯

Have the protective devices against overheating (temperature sensor evaluation)
been activated?

¯

Is the controller correctly parameterised for the motor?
(

, Controller operating instructions)

¯

Are the electrical connections o.k.?

¯

Does the motor connection have the correct phase sequence?

¯

Are rotating parts and surfaces which can become very hot protected against
accidental contact?

¯

Is the contact of good electrical conductivity if a PE connection on the motor
housing is used?