Panel installation – Metal Sales Image II Installation User Manual

Page 19

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 6/2011

19

Panel Installation

1. Snap second panel in place making sure panel ends are aligned.

Snap panel in place working from one end to the other.

2. Fasten substrate with a #8-18 x

3

/

4

" Truss Head Woodscrew in

the center of the fastening groove located along the male leg
of the panel. Fastener spacing must be designed to meet local
building codes.

3. Fasten Image II panel with (4) #9-16 x 1" Woodscrews through

Double Bead Tape Sealant, flashing, and into the solid sub-
strate below.

4. Continue with previous step until installation is complete. It

is important that the fastener is in the center of the fastening
groove, and make sure not to over-tighten the screws.

5. Once installation is complete, fill each lower end of panel rib

with Tube Sealant, and clean any debris and excess sealant
before continuing to next area.

CAUTION

Additional screws

may be required for

high snow loading

and steep slopes.

Position panel to keep ends

flush (2)

#9-16 x 1

"

Woodscrew

(3)

Double Bead Tape Sealant (1)

Apply sealant at all

rib ends along eave

(4)

Step 2

Exposed Fastened Panel Installation

Installing Second Panel

(X) Numbers indicate sequence of installation.

Advertising