Image II Panel (1)
Moisture Barrier

Tube Sealant (7)
Fasteners By Others (5)

Step Rakewall (3)

Reglet Flashing (6)

Tape Sealant (2)

#9-16 x 1" Woodscrew,

1' o.c. (4)

Rakewall with Reglet Detail

1. Roof panel must be installed before Rakewall flashing.

2. If the panel ends off module, bend flat part of the panel up a

minimum of 1", otherwise skip to the next note.

3. Apply a row of Double Bead Tape Sealant to the flat part of the

panel next to the panel rib or vertical field bent leg.

4. Install Rakewall to the and attach with #9-16 x 1" Woodscrews,

1' o.c. to the flat pan of the Image II Panel.

5. Install Reglet in field cut groove in the parapet wall. Seal

Reglet to parapet wall with Tube Sealant.

6. If two or more flashings are required, lap the flashing over

the previously installed flashing by a minimum of 2" placing a

bead of Tube Sealant between the flashings and securing with

Pop Rivets, 2" o.c.

Optional Rakewall

With 1" Z-Closure

(X) Numbers indicate sequence of installation.