Post-Hung Gutter Detail

Optional Gutter

with offset cleat

All Eave flashings must be installed prior to panel installation.

1. Install Eave flashing by resting the flashing against the

substrate and fasten with #8-18 x

3

/

4

" Truss Head Woodscrews,

4' o.c. to hold the Eave flashing in place during installation.

2. Apply a row of Double Bead Tape Sealant on the top leg of the

Eave flashing.

3. Install first panel so that the panel end has proper overhang

making sure that panel is square to eave and rake.

4. Fasten substrate with a #8-18 x

3

/

4

" Truss Head Woodscrew in

the center of the fastening groove located along the male leg
of the panel. Fastener spacing must be designed to meet local
building codes.

5. Fasten Image II panel with (4) #9-16 x 1" Woodscrews through

Double Bead Tape Sealant, flashing, and into the solid sub-
strate.

6. Slide the Gutter flashing behind Eave Flashing and fasten

through Fascia Bracket and Flashing into the substrate. Pop
Rivet the Gutter flashing to Fascia Bracket.

Note: If two or more flashings are required, lap the flashing over the
previously installed flashing by a minimum of 2" placing a bead of

Tube Sealant between the flashings and securing with Pop Rivets,
2" o.c.

(X) Numbers indicate sequence of installation.

Image II Panel (4)

Moisture Barrier

Gutter Flashing (By Others) (6)

#9-16 x 1" Woodscrew (5)

Eave (1)

Double Bead Tape Sealant (3)

Truss Head Woodscrew,

4' o.c. (2)