Rake Detail

1. Roof panel must be installed before Rake flashing.

2. If the panel ends off module, bend flat part of the panel up a

minimum of 1", otherwise skip to the next note.

3. Apply a row of Double Bead Tape Sealant to the flat part of the

panel next to the panel rib or vertical field bent leg.

4. Position and install Cleat to wall with #8-18 x

3

/

4

" Truss Head

Woodscrew, 1' o.c. Make sure Cleat installation allows for

proper Rake attachment.

5. Install Rake by sliding the open hem onto the Cleat and then

attaching to the flat pan of the Image II panel with #9-16 x 1"

Woodscrews, 1' o.c.

6. If two or more flashings are required, lap the flashing over

the previously installed flashing by a minimum of 2" placing a

bead of Tube Sealant between the flashings and securing with

Pop Rivets, 2" o.c.

Image II Panel (1)

Rake (5)
Truss Head Woodscrew,

1' o.c. (4)
Cleat (3)

Double Bead Tape Sealant (2)

Moisture Barrier

Optional Rake

with 1" Z-Closure

#9-16 x 1" Woodscrew,

1' o.c. (6)

(X) Numbers indicate sequence of installation.