Panel installation, Hemming detail – Metal Sales Image II Installation User Manual

Page 20

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice, effective 6/2011

20

Panel Installation

Note: Moisture Barriers, Eave, Valley, and Offset Cleat flashing

must first be installed before panel installation can begin Image II

panels are installed from left to right or right to left.

1. Install Eave flashing and Valley flashing as shown on pages

16-17.

2. Apply a row of Double Bead Tape Sealant on the bottom leg of

the Offset Cleat and align on substrate.

3. Fasten Offset Cleat to substrate with a #8-18 x

3

/

4

"

Truss Head

Woodscrew through top of Eave flashing and into substrate,

1' o.c. Make sure Offset Cleat is lined up to properly accommo-

date hemmed panel.

4. Field notch and hem the Image II panel as shown below.
5. Apply a single bead of tube sealant inside the open hem of the

Image II panel.

Note: If you are to field bend the panel ends to close off panels on

the low side, see page 22 before field notching and hemming of the

panels.

Double Bead Tape Sealant (2)

Truss Head Woodscrew (4)

Offset Cleat (3)

Hemming Detail

Field Notch Rib (5)

1

1

/

2

"

1

1

/

2

"

Field bend flat part

of panel to accept

Offset Cleat (6)

Hemming Tool

Field apply tube sealant

in hem and slide onto

pre-installed Offset Cleat

(7)

Step 1

Concealed Fastened Panel Installation

Installing First Panel

Eave Flashing (1)

(X) Numbers indicate sequence of installation.

Advertising