Item

Regulator Output Pressure Gage

13

Regulator Shut-Off Valve

14

Regulator Output Pressure Valve

15

Nitrogen Supply Hose

16

Input Check Valve

17

Bleed Valve

18

Extension Hose

19

Gage Protector (factory set to limit pressure to the gage to approximately 1.4 MPa
(200 psi)

20

High Pressure Gage—0–21 MPa (0–3000 psi)

21

Low Pressure Gage—0–2.1 MPa (0–300 psi)

22

Chuck Valve

23

2. With an open-end wrench, turn the locknut counterclockwise on the accumulator valve assembly to open

the valve. Read the pressure on either the high or low accumulator charging kit pressure gage.

a) If the pressure reading is other than the required pressure level recorded on the accumulator, continue

with the next subsection, “Change the Precharge Pressure”.

b) If the pressure level corresponds to the level recorded on the accumulator label, turn the locknut

clockwise to close the valve and continue this procedure.

3. Open the bleed valve on the accumulator charging kit and remove the chuck valve from the accumulator.

Replace the valve stem cap and protective cover on the accumulator.

Change the Precharge Pressure

Often the precharge of an accumulator mounted on a hydraulic supply line is increased to enhance system
performance and reduce the transient HPS flow demands. Accumulators may be precharged to 10 MPa (1500
psi) or more, although amounts above 14 MPa (2200 psi) will have less and less performance effect in most
situations. Be sure that you read the following warning before you charge your accumulator.

MTS Landmark™ Floor Standing Load Units Product Information 103

Maintenance

Advertising
This manual is related to the following products: