Item

Isolation Pads

2

Load Unit

3

57 - 63 mm (2.25–2.5 in)

4

83 - 89 mm (3.25–3.5 in)

0.41 MPa (60 psi)

5

0.55 MPa (80 psi)

Install shims to level.

6

7. Remove the slings/chains.

8. Secure the load unit.

The load unit must be secured to an adequate platform before it can be operated. The base of tabletop
load units have a threaded hole in each corner (M16 X 2.00 mm).

a) If necessary, drill four mounting holes for the load unit. The load unit hole pattern is shown below.

Tabletop Load Unit Mounting Hole Pattern

b) Position the load unit onto its isolation pads.

c) Align the load unit with the mounting holes. Install the threaded stud into the threaded hole in each

corner of the load unit.

d) Mount the load unit on the workbench using the hardware included with the isolation tie-down kit.