MTS Landmark Floor Standing User Manual

Page 77

Advertising
background image

Annually

Biweekly

Weekly

Daily

Calendar Time using 8 hour Running
Time Rate Per Day

2,000

1,500

1000

500

80

40

8

Running Time-Hours

MTS

MTS

MTS

MTS

MTS

Ensure that the crosshead columns are
clean.

MTS

MTS

MTS

MTS

MTS

Ensure that there are no extreme column
abrasions.

MTS

MTS

MTS

MTS

MTS

Ensure that the crosshead speed is
appropriate.

MTS

MTS

MTS

MTS

MTS

Test to ensure the crosshead unlock causes
a program interlock.

MTS

MTS

MTS

MTS

MTS

Check the condition of all load frame support
airbags and pads.

MTS

MTS

MTS

MTS

MTS

Ensure that the crosshead movement is
smooth.

MTS

MTS

Ensure that the hydraulic crosshead locks
are functioning properly.

MTS

MTS

Bleed the crosshead lift cylinders.

MTS

Lubricate the manual crosshead lock bolts.

MTS

Replace the hydraulic lock cap screws.

6

Actuator

MTS

MTS

MTS

MTS

Complete a cursory check of the actuator.

MTS

MTS

MTS

MTS

Ensure that the actuator area is dry.

MTS

MTS

MTS

MTS

Ensure that the actuator platen area is
clean.

MTS

MTS

MTS

MTS

Ensure that the piston rod wear is at an
acceptable level.

MTS

MTS

MTS

MTS

Lubricate the axial/torsional spline. (Bionix
frame at 75-100 hrs)

MTS

MTS

MTS

MTS

Verify the performance at low velocity in the
up direction.

MTS

MTS

MTS

MTS

Verify the performance at low velocity in the
down direction.

6

Replacement of the hydraulic crosshead lock cap screws is recommended every 5 years or 5500 duty cycles,
whichever comes first.

MTS Landmark™ Floor Standing Load Units Product Information 77

Maintenance

Advertising
This manual is related to the following products: