Description

Name

Item

Allows leveling of the load frame.

Leveling Foot

13

Anchor point for the lower grip.

Base Adapter

14

Removable test surface.

Mat

15

Test area found on all MTS Criterion Series 40
models.

Lower Test Space

16

Anchor point for the upper grip.

Adapter

17

Secures the grip to the adapter.

Pin

18

Measures forces imparted on the specimen.

Force Sensor (Load cell)

19

The moving component of the load frame that imparts
a load on the specimen.

Crosshead

20

Anchor point for the lower grip on dual-zone test space
models.

Adapter

21

These components cover the rotating ball screws that
move the crosshead.

Ball Screw Cover

22

Anchor point for the upper grip on dual-zone test
space models.

Adapter

23

Measures forces imparted on the specimen. Only
dual-zone test space models have load cells mounted
to the top beam.

Load cell

24

Stationary beam that secures the two columns.

Top Beam

25

Load Unit Control Panel

The load unit control module (LUC) contains the Machine Active indicator and the Emergency Stop button.

The LUC is enabled by pressing the Enable button on the handset.

28 | MTS Criterion

Series 40

System Introduction