Operation, Moving and mounting the bell – MTS Triaxial Cell Models 656-06 User Manual

Page 36

Advertising
background image

Operation

This chapter describes how to set up and run tests on your Triaxial Cell.

Performing Tests details how to run tests on the Triaxial Cell. It covers building and installing the specimen,
pressurizing the Cell, and removing the specimen after depressurizing the Cell.

Changing Between Compression and Extension/Pore Pressure Test Setups details what must be done to
switch between a setup ready to run a compression test to one ready to run an extension/pore pressure
test.

Important:

Always close and latch the door before beginning a test.

Moving and Mounting the Bell

The bell is attached to rails to allow for movement in and out of the load frame when the triaxial cell is not
in use. The rails have mechanical stops on the front and back to prevent the bell from sliding off. This
section provides a brief overview of the steps involved in moving and mounting the bell.

Description

Item

Set the control mode to Setup.

1

36 | Triaxial Cell Product Information

Operation

Advertising
This manual is related to the following products: