Operating the machine – Retsch Emax User Manual

Page 33

Advertising
background image

Operating the machine

33

•

Pull out the locking pin (D) to release from the groove (DN).

•

Twist the locking pin 90 degrees to release it permanently.

•

Turn the twist grip (C) to open the grinding jar support.

•

Only remove the grinding jar with closed lid.

•

Only open the grinding jar in a safe position (e.g. extraction device).

•

Only open the grinding jar once it has cooled down.

Fig. 20: Removing the grinding jar

5.5.2

Closing

With this grinding device, a very large amount of energy enters the sample
material.
•

Therefore make sure that the grinding jar support has been closed properly.

•

Before grinding check the lock on the grinding jar support (V).

Fig. 21: Locking the grinding jar support

The twist grip (C) of the grinding jar support (G) is secured by locking pin (D) to
prevent inadvertent opening.
•

Twist the locking pin (D) until it engages in the groove (DN).

G

DN

C

D

V

Advertising