This chapter describes procedures to mount the Beacon 110 Gas Monitor, make wiring
connections to the monitor, and start up the monitor.

WARNING:

Perform all installation and start-up procedures in a “fresh air” environment
(environment known to be free of combustible gas, toxic gas, and of normal
oxygen content). The Beacon 110 is not in operation as a gas monitoring system
until the start-up procedure is complete.

Mounting the Beacon 110

Perform the following procedure to install the instrument housing at the mounting site.

Figure 6: Beacon 110 Outline & Mounting Dimensions

1.

Select the mounting site. When you select the mounting site consider the following
factors:

1.83

4.00

.30 Dia. x .50 Slot, 4X

1.70

7.20

3/4 Conduit Hub (2X)

Note: All Dimensions in Inches

3.03

1.47

10.00

8.94

8.50

4.50