Wiring the beacon 110 – RKI Instruments Beacon 110 User Manual

Page 17

Advertising
background image

Beacon 110 Operator’s Manual

13

Is an AC or DC power source available?

Is there enough room to open the housing door and make wiring connections
through the conduit hubs at the bottom of the housing?

Are the display screen and status lights visible?

2.

If necessary, close and latch the housing door.

3.

Position the monitor on a vertical surface at eye level (4 1/2 to 5 feet from the floor).

4.

Insert 1/4 in. or 5/16 in. screws through the slots in the mounting feet at each corner of
the housing to secure the housing to the mounting surface.

Wiring the Beacon 110

This section describes procedures to connect the AC power source, DC power source,
external alarm(s), recorder, and detector head.

WARNING:

Make all connections to the Beacon 110 before you plug in or turn on the AC or
DC power source. Before you make any wiring adjustments, always verify that
all power sources are not live.

Connecting the AC Power Source

NOTE:

If you are using DC power as the primary power source, go to the next section,
“Connecting the DC Power Source”.

The AC in terminal strip will accept 24 - 14 AWG wire. All connections to building electrical
systems must be installed in accordance with local requirements and must be installed by
qualified personnel. If this equipment is used in a manner not specified by the
manufacturer, the protection provided by the equipment may be impaired. Install an
appropriate switch or circuit breaker in the AC line close to the Beacon 110 that meets the
local electrical code and within easy reach of the operator. The switch or circuit breaker
must be marked as the disconnecting device for the Beacon 110.

Perform the following procedure to connect the AC power source to the Beacon 110.

WARNING:

Verify that the power source is unplugged or turned off before you continue
with this procedure.

1.

Turn off or unplug all incoming power to the Beacon 110.

2.

Open the housing door, then place the power switch in the OFF position.

CAUTION:

The power switch does not control DC input power.

3.

Install an appropriately rated cable bushing or conduit to the left conduit hub on the
bottom of the Beacon 110 housing.

4.

Locate the 3-point AC in terminal strip in the lower left corner of the main PCB (see
Figure 1). The terminals are labelled L, N, and G.

5.

Guide the AC power cord or wires through the left conduit hub on the bottom of the
Beacon 110 housing.

Advertising