Chapter 3: installation & startup, Overview, Mounting the beacon 110 rig monitor – RKI Instruments Beacon 110 Rig Monitor User Manual

Page 16

Advertising
background image

11

Beacon 110 Rig Monitor Operator’s Manual

Chapter 3: Installation & Startup

Overview

This chapter describes procedures to mount the Beacon 110 Rig Monitor, make wiring connections
to the monitor, and start up the monitor.

WARNING:

Perform all installation and start-up procedures in a “fresh air” environment
(environment known to be free of toxic gas, and of normal oxygen content). The
Beacon 110 Rig Monitor is not in operation as a gas monitoring system until the
start-up procedure is complete.

Mounting the Beacon 110 Rig Monitor

Perform the following procedure to install the instrument housing at the mounting site.

Figure 5: Beacon 110 Rig Monitor Outline & Mounting Dimensions

RESET

ALM 1

FAIL

BEACON 110

GAS MONITOR

ALM 2

4.00 MTG

4.83

Ø .30 X .50 SLOTS (4X) MOUNTING

Door Latches

3.03

3/4 Cable
Bushings
(2X)

3/4

Conduit

Hubs (3X)

4.50"

5.6

1.47

10.00

1.70

8.0" Max

7.20

8.50

8.94 MTG