Therma-Tru SHOP 3 Door Preparation - U1 Revised User Manual

Page 29

Advertising
background image

Door
Preparation

Shop 3

2014 (U1 REVISED)

3.29

Multipoint Lock Preparation

(Except Fire & Steel Doors)

Power Tool Notes:
Remember to always follow the safety and operation instructions of the equipment
manufacturers.

Tools Required:

Plunge router with 1/2” bit and

13/16” collar (Provided in door kit)

Drill bit 7/16”

Drill bit stop (provided)

1/8” Hex head wrench

UNIT SIZE

HANDLE

HEIGHT

6/6

6/8, 8/0

33.452”
36.000“

Step 1- Sidelite Handle/Mortise Jig for the Venting S/L units

Using the information given below, determine the handle position. Place the pin in the hole at the bottom that
is marked with the correct handle height. Attach the wing nut to the pin to secure it in place.

Set the router plunge depth to 50.5mm (1.988”).

Slide the drill stop over the 7/16” drill bit and then rest the bit on the top of the jig. The bit should extend to a
depth of 31.75mm (1.250”) or 1-1/4” into the sidelite. Tighten the stop with a 1/8” hex head wrench. Adjust if

Note: With a sidelite system the thumb turn is on the interior side only. As a safeguard the jig has this instruc-
tion etched on the top. Drill from the interior side only.

Slide the jig over the lock stile of the sidelite such that the locator pin is resting against the bottom rail.

to the panel. Do not over tighten.

Using the 7/16” drill bit with drill stop, bore the 3 handle holes on the inside surface of the door.
Do not drill all the way through the sidelite.

Plunge route the top slot to a depth of 33.5mm (1.3”) or 1-15/16”. For best results, use multiple passes to
avoid chipping out the wood.

Remove jig, clean out the saw dust, and install multipoint locking hardware and thumbturn.

Advertising