Classic-craft panel installation – Therma-Tru SHOP 3 Door Preparation - U1 Revised User Manual
Page 32
Advertising
Door
Preparation
3.32
2014 (U1 REVISED)
Shop 3
Classic-Craft Panel Installation
Door
Preparation
5. Apply two (2) 1/4” - 3/8” beads of structural adhesive to back of panel.
6. Remove backing from tape,
position panel, and press
firmly into place.
4. Flip door over.
Panel
Insulating Foam
Door
Press here with
approximately 10 psi.
Adhesive
Advertising