2 - installation and wiring, Pre-installation instructions, 2installation and wiring – Rockwell Automation 20D-P2-DG03 DriveGuard Safe Torque Off Option for PowerFlex 700S Phase II and 700L Drives User Manual

Page 15

Advertising
background image

Rockwell Automation Publication 20D-UM007G-EN-P - March 2012

15

Chapter

2

Installation and Wiring

Pre-Installation Instructions

Installation must be in accordance with the following steps and must be
carried out by competent personnel. The DriveGuard Safe Torque Off option
is intended to be part of the safety related control system of a machine. Before
installation, a risk assessment should be performed that compares the
DriveGuard Safe Torque Off option specifications and all foreseeable
operational and environmental characteristics of the machine to which it is to
be fitted.

A safety analysis of the machine section controlled by the drive is required to
determine how often the safety function should be tested for proper
operation during the life of the machine.

ATTENTION: The following information is merely a guide for proper
installation. Rockwell Automation, Inc. cannot assume responsibility
for the compliance or the noncompliance to any code, national, local or
otherwise for the proper installation of this equipment. A hazard of
personal injury and/or equipment damage exists if codes are ignored
during installation.

Advertising