Option board installation – Rockwell Automation 20D-P2-DG03 DriveGuard Safe Torque Off Option for PowerFlex 700S Phase II and 700L Drives User Manual
Page 16
Advertising

16
Rockwell Automation Publication 20D-UM007G-EN-P - March 2012
Chapter 2 Installation and Wiring
Option Board Installation
PowerFlex 700S Frames 1…6 and PowerFlex 700L Frames 3A and
3B
1. Remove the I/O Control Cassette from the drive.
Task Description
Open the door of the power structure and disconnect the cables that connect to
the main board.
Loosen the screws on the face of the cassette.
Remove the cassette.
A
B
C
B
C
A
(PowerFlex 700S shown)
Advertising
This manual is related to the following products: