Applying power, Start-up status indications, Applying power -9 – Rockwell Automation 22-COMM-B PowerFlex BACnet MS/TP Adapter User Manual

Page 25

Advertising
background image

Installing the Adapter

2-9

Apply power to the drive. The adapter receives its power from the
connected drive. When you apply power to the adapter for the first time,
its topmost status indicator “PORT” should be solid green after an
initialization. If it is red, there is a problem. Refer to

Chapter 5

,

Troubleshooting

.

Start-Up Status Indications

Status indicators for the drive and communications adapter can be
viewed on the front of the drive (

Figure 2.8

) after power has been

applied. Possible start-up status indications are shown in

Table 2.B

.

Figure 2.8 Drive and Adapter Status Indicators (location on drive may vary)

Applying Power

!

ATTENTION: Risk of equipment damage, injury, or death exists.
Unpredictable operation may occur if you fail to verify that parameter
settings and switch settings are compatible with your application.
Verify that settings are compatible with your application before
applying power to the drive.

Advertising