Rockwell Automation 21G 750-Series POD Remote Mounting Kit User Manual

Page 11

Advertising
background image

Rockwell Automation Publication 750-IN015B-EN-P - September 2011

PowerFlex 750-Series Control Pod Remote Mounting Kit

11

3.

Connect the 23 m (75 ft) internal 24V power wire harness to P14 on the
fiber interface board.

4.

Connect the 23 m (75 ft) inverter fiber-optic cable to P1 (INV1) on the
fiber interface board.

Fiber Interface Board Connections

5.

Route the 23 m (75 ft) internal 24V power wire harness and inverter fiber-
optic cable back to the drive enclosure.

6.

Install the three Twist-Lock cable supports in the positions shown on

page 12

using the M4 x 12 mm long machine screws supplied.

P1

INV1

P2

INV2

P3

INV3

P14

P13

No.

Name

Description

Internal 24V Power Connection Two point connector to P14.

External 24V Power Connection Optional user-supplied power supply

(1)

connection to P13.

(Three point connector supplied in kit.)

(1) Refer to

Optional External Power Supply on page 13

, for power supply requirements and connection details.

Inverter Fiber-optic Connection

Fiber-optic cable connection to P1 fiber-optic cage INV1 on
fiber interface board.

IMPORTANT

Minimum inside bend radius for fiber-optic cable is 25.4 mm
(1 in.). Any bends with a shorter inside radius can permanently
damage the fiber-optic cable. Signal attenuation increases
with decreased inside bend radii.

Advertising
This manual is related to the following products: