Rockwell Automation 1413-CAP-ME-PE Capacitor Bank Controller, Series C User Manual

Page 14

Advertising
background image

14

Rockwell Automation Publication 1413-UM001D-EN-P - November 2010

Chapter 2 Installation

DIN Rail Mounting

The maximum extension of the latch is 14 mm (0.55 in.) in the open position. A
screwdriver is required for removal of the controller. The controller can be
mounted to EN50022-35x7.5 or EN50022-35x15 DIN rails. DIN rail mounting
dimensions are shown below.

Follow these steps to install your controller on the DIN rail.

1.

Mount your DIN rail. Make sure that the placement of the controller on
the DIN rail meets the recommended spacing requirements
(see

Controller Spacing on page 13

for more information).

Refer to the mounting template inside the back cover of this document.

2.

If it is open, close the DIN latch.

3.

Hook the top slot over the DIN rail.

4.

While pressing the controller down against the top of the rail, snap the
bottom of the controller into position.

5.

Leave the protective debris strip attached until you are finished wiring the
controller and any other devices.

Follow these steps to remove your controller from the DIN rail.

1.

Place a screwdriver in the DIN rail latch at the bottom of the controller.

2.

Holding the controller, pry downward on the latch until the latch locks in
the open position.

3.

Repeat steps 1 and 2 for the second DIN rail latch.

Dimension

Height

A

90 mm (3.5 in.)

B

27.5 mm (1.08 in.)

C

27.5 mm (1.08 in.)

A

B

C

Advertising
This manual is related to the following products: