3 - configuration, Overview, Chapter 3 – Rockwell Automation 1413-CAP-ME-PE Capacitor Bank Controller, Series C User Manual

Page 29: Configuration, Chapter

Advertising
background image

Rockwell Automation Publication 1413-UM001D-EN-P - November 2010

29

Chapter

3

Configuration

Overview

The capacitor bank controller base unit has been set up to require minimal out-
of-box configuration.

The base system has default communication settings. Certain circumstances and
options require additional communication configuration, which may include the
use of programming software not included with the controller.

You are required to configure the PowerMonitor 1000 meters to coordinate them
to the power circuit in the base unit and all options. Configuration of the
PowerMonitor 1000 meter is performed by using the display on the meter.

The MicroLogix 1400 controller requires configuration to coordinate it to the
number and size of steps that exist in the capacitor bank being controlled, as well
as the desired operating mode and other selections. Use the built-in LCD
interface on the MicroLogix 1400 controller or the optional PanelView
Component C600 terminal to configure the controller.

ATTENTION: Do not operate the capacitor bank controller without first
configuring it to suit the controlled capacitor bank and system options.
Unpredictable operation, including undesirable power system effects,
may result.

IMPORTANT

The capacitor bank controller is compatible with the PanelView
Component C600 terminal firmware revision 1.3 or later.

Advertising
This manual is related to the following products: