Publication 2706-6.4

2-8

Installation and Startup

Power Connections

Before making power connections, make sure that the power is turned off.
The DL5 Slave requires 12-24Volts DC, 250-125 mA (300mA inrush).

Operate / Configure Switch

The Operate / Configure switch (position 1) is located on the back of the
DL5 Slave. The switch in position 2 is not used.

For normal operation, the switch (position 1) should be in the up (on)
position. Setting the switch in the down (off) position causes the DL5 to
enter the configuration mode.

1

2

TB2

Common

12-24V DC

!

ATTENTION: Improper wiring of the power
connections may result in damage to the DL5 Slave.
The DL5 Slave does not contain any fuses. We
recommend that you use external fusing to prevent
damage to the DL5 slave or power supply.

1 2

SW1

1 2

SW1

Configure

Operate

(Up)

(Down)