11. For 800 mm Deep Columns, first complete step 9; then, working
from the left, use the M6 hex head bolt, lock washer and nut
hardware provided in the power bus splice kit to fasten the two
additional joining holes together.
Ensure cabinets are tightly pushed together.
Joining Hole Locations 800 mm Deep
Torque Requirements for Hardware Connections
on
for torque requirements.
12. Inspect the interior for dust and dirt.
Vacuum cleaning is recommended.
IMPORTANT
Do not use hardware to draw cabinets together.
IMPORTANT
Do not clean using compressed air. It may contain moisture and may
blow debris into the control equipment.
773,0
(30.43)
747,0
(29.41)
744,0
(29.29)
353,0
(13.90)
336,0
(13.23)
353,0
(13.90)
336,0
(13.23)
89,0
(3.50)
M6
M6
M6 Hex
M6
M6
M6
M6
M6 Hex
365,0
(14.37)
Front