Positioning the motor control center – Rockwell Automation 2500 CENTERLINE MCC Joining and Splicing Columns User Manual

Page 8

Advertising
background image

Publication 2500-IN004A-EN-P - August 2009

8 CENTERLINE 2500 Motor Control Centers Installing, Joining and Splicing Columns

Positioning the Motor Control Center

Follow these procedures for positioning your Motor Control Center.

1. Identify the left most column.

Refer to CENTERLINE 2500 Low Voltage Motor Control Centers
Instructions, Chapter 1 - Motor Control Center Sequence
Numbering, publication

2500-IN001

.

Left Most and Sequential Columns

2. Depending on the installation site, begin with the leftmost or

rightmost column and install one shipping block at a time.

3. Position the MCC in the location where it is to be installed.

The surface of the floor must be level.

Refer to Receiving, Handling and Storing CENTERLINE 2500
Motor Control Centers Instructions, publication

2500-IN002

, for

handling guidelines.

TIP

The horizontal power bus does not extend past the MCC of the left
most column. For sequential columns, the horizontal power bus will
extend past the MCC.

Advertising