Switch settings, Manual override - maximum heat, Manual override - purge – tekmar 654 Snow Melting Control Installation User Manual

Page 9: Manual override - off, Manual override - test

Advertising
background image

9

of

44

©

2013 654_D

-

06/13

Manual Override - Maximum Heat

In hydronic application modes, the control includes a
Maximum Heat operation where the control operates the
snow melting system to maintain the maximum allowed
heating setpoints. This allows testing of the snow melting
system during warm weather.

Step 1: Press and hold the Home button for 3 seconds.
Step 2: Press NEXT to navigate to the Override menu.
Step 3: Press ENTER to enter the Override menu.
Step 4: Select Manual Override to Max.
Step 5: Select the Maximum Heat Time after which the control

resumes normal operation.

Step 6: Exit the Manual Override by selecting Auto.

When operating a hydronic snow melting system, it is neces-
sary to purge and bleed all air out of the system. The control
includes a Purge operation where the System Pump as well
as pumps operated by the tekmarNet

®

system are all turned

on to assist in purging air from the system.

Step 1: Press and hold the Home button for 3 seconds.
Step 2: Press NEXT to navigate to the Override menu.
Step 3: Press ENTER to enter the Override menu.
Step 4: Select Manual Override to Purge.
Step 5: Select the Maximum Purge Time after which the control

resumes normal operation.

Step 6: Exit the Manual Override by selecting Auto.

Manual Override - Purge

The snow melting system can be manually turned off and the
control remains off until manually changed back to Auto. This
allows the installer or end user to permanently disable the snow
melting system without removing power from the control.

Step 1: Press and hold the Home button for 3 seconds.
Step 2: Press NEXT to navigate to the Override menu.
Step 3: Press ENTER to enter the Override menu.
Step 4: Select Manual Override to Off.
Step 5: Exit the Manual Override by selecting Auto.

Manual Override - Off

When operating an electric snow melting system, the control
includes a Test operation where the electrical heating cables
can be energized for 10 minutes after which the control
resumes normal operation. This allows testing of the electric
snow melting system during warm weather.

Step 1: Press and hold the Home button for 3 seconds.
Step 2: Press NEXT to navigate to the Override menu.
Step 3: Press ENTER to enter the Override menu.
Step 4: Select Manual Override to Test.
Step 5: Exit the Manual Override by selecting Auto.

Manual Override - Test

Switch Settings

Switch Position Action

1

ON

LOCK ACCESS LEVEL

The control is locally locked and the access level cannot be changed.
Set to Lock when installation has been completed.

OFF

UNLOCK ACCESS LEVEL

The control is unlocked and the access level may be changed. Go to
the Toolbox menu to change the access level. Set to Unlock during
the installation process.
Note: tekmarNet

®

system controls include a Global Lock that locks all

connected snow melt controls, and thermostats. Set the tekmarNet

®

system control to unlock to allow access level adjustment on all
connected devices.

2

ON

Not used

OFF

Not used

Meets Class B: ICES & FCC Part 15

Power: 24 V (ac) ±10%, 60 Hz, Class 2,

16 VA standby, 100 VA fully loaded

Relays: 24 V (ac) 2 A, 3.5 A combined

1058-01

Switch

Se

ttings

www.tekmarControls.com

Designed and assembled in Canada

Lock

Unused

Unlock

ON

1 2

H1220A

Snow Melting Control 654

tekmarNet Electric or Hydronic Boiler/Mixing

Back of Control

Testing the Relay Outputs -----------------------

-----------------------

The control includes an Override menu to check if the control’s
relays are operating and that the control is wired correctly to
the snow melting equipment.
Step 1: Press and hold the Home button for 3 seconds.
Step 2: Press NEXT to navigate to the Override menu.
Step 3: Press ENTER to enter the Override menu.
Step 4: Select Manual Override to Hand.
Step 5: For hydronic systems, set System Pump to On. The

system pump should now be operating.

Step 6: Set Heat Relay to On. The boiler or electric heating

cables should start heating.

Step 7: For modulating boilers change the Boiler Percent from

0 to 100%. The boiler should be firing.

Step 8: For a mixing valve or mixing injection pump, change

the Mix Percent from 0 to 100%. The mixing valve
should open or the mixing injection pump should
increase speed.

Step 9: Select the Override Time after which the control

resumes normal operation.

Step 10: Exit the Manual Override by selecting Auto.

Advertising