6 machine torch leads replacement (continued) – Tweco 15XC Merlin User Manual

Page 82

Advertising
background image

CUSTOMER/OPERATOR SERVICE

5-10

Manual 0-2251

5.6 MACHINE TORCH LEADS REPLACEMENT (continued)

10. Position the nylon outer sleeving over the shielded

inner sleeving. The shielded inner sleeving must be
completely covered by the outer sleeving to avoid any
possible contact with the mounting assembly.

11. Secure the nylon outer leads sleeving to the leads with

electrical tape. Position the tape close to the back of the
mounting assembly.

Refer to Figure 5-E and:

12. Open the leads connection access door on the power

supply. Remove the hose clamp that secures the
shielded inner leads sleeving to the brass grounding
tube.

13. Disconnect the plasma, secondary, coolant supply and

coolant return leads from the bulkhead.

14. Position the replacement leads and connect the plasma,

secondary, coolant supply and coolant return leads to
the bulkhead.

15. Attach the shielded inner leads sleeving to the brass

grounding tube and secure with hose clamp. The
shielded inner sleeving must not contact any torch
fittings, ferrules, or connections.

Machine Torch Leads

Replacement (continued)

Power Supply Connections

Advertising