3-9

INSTALLATION PROCEDURES

A. Hand Systems

B. Machine Systems (Unshielded Leads)

C. Machine Systems (Shielded Leads)

D. Remote Pendant Control (Optional)

The Torch Leads must be properly installed to the Power
Supply for proper operation. If the torch leads were not
factory installed, make all torch connections to the Torch
Bulkhead Panel for the desired application.

NOTE

Equipment ordered as a system will have the Torch
factory connected to the Power Supply.

Connecting the Torch Leads to the Power Supply requires
gaining access to the Torch Bulkhead Panel in the Power
Supply per the following procedure:

1. Turn the two latch screws securing the Access

Panel to the power supply front panel.

A-03046

Control/Access Panel

Latch Screw

Latch Screw

Figure 3-12 Access Panel

2. Lift up on the Access Panel to gain access to the

Torch Bulkhead Panel.

A. Hand Systems

Connect the Hand Torch to the Power Supply using the
following procedure:

1. Open the Access Panel to gain access to the Torch

Bulkhead Panel.

2. Feed the end of the Torch Leads through the rub-

ber boot on the front panel in the following order
(see NOTE):

• Control Cable Connector

• Torch Coolant and Gas Leads

NOTE

Feed the Control Cable through the rubber boot first
as there will not be enough space inside the rubber
boot for the connector if the Coolant and Gas Leads
have been fed through the rubber boot first.

A-02949

Secondary

Gas

Plasma (+)

Gas

Control Cable

Connector

Coolant

Return

Coolant

Supply (-)

Control

Cable

Figure 3-13 Hand Torch Leads Connections

3. Connect torch coolant and gas leads to connec-

tors on the Torch Bulkhead Panel.

4. Close the access panel and turn the two latch

screws.

5. Check the torch for proper parts assembly.

B. Machine Systems (Unshielded Leads)

Systems ordered with Unshielded Machine Torch will
include a Remote Hand Pendant. The Remote Hand Pen-
dant allows the operator to start the cutting operation
from a remote location.

2

3

4

12

14

13

Torch Control

Cable Connector

Remote Pendant/CNC

Cable Connector

PIP

Circuit

Control

OK-To-Move

3

4

12

14

13

A-01366

Figure 3-14 Remote Pendant Connector Diagram

Advertising