Tweco PAK Master 150XL User Manual

Page 26

Advertising
background image

INSTALLATION PROCEDURES

3-10

Manual 0-2864

NOTE

Equipment ordered as a System will have the Con-
trol Cable and Torch Leads factory connected to the
Power Supply.

Connect the Remote Hand Pendant and Torch Leads to
the Power Supply using the following procedure:

1. Open the Access Panel to gain access to the Torch

Bulkhead Panel.

2. Feed the connector on the end of the Remote Hand

Pendant Control Cable through the rubber boot
on the front panel of the Power Supply (see
NOTE).

NOTE

Feed the Control Cable through the rubber boot first
as there will not be enough space inside the rubber
boot for the connector if the Coolant and Gas Leads
have been fed through the rubber boot first.

3. Connect the Remote Hand Pendant Control Cable

connector to the Control Cable connector on the
Torch Bulkhead Panel.

4. Feed the end of the Torch Leads through the rub-

ber boot.

A-02950

Secondary

Gas

Plasma (+)

Gas

Remote Hand

Pendant Control

Cable

Coolant

Return

Coolant

Supply (-)

Control Cable

Connector

Figure 3-15 Unshielded Machine Torch Connections

5. Connect torch coolant and gas leads to connec-

tors on the Torch Bulkhead Panel.

6. Close the Access Panel and turn the two latch

screws.

7. Check the torch for proper parts assembly.

C. Machine Systems (Shielded Leads)

Systems ordered with Shielded Machine Torch will in-
clude a Computer Control (CNC) Control Cable. The
CNC Control Cable allows the Power Supply to interface
with a computer or other control device.

NOTE

Refer to Appendix 5 for CNC Control Cable Inter-
face Signal Diagram.

Connect the CNC Control Cable and Torch Leads to the
Power Supply using the following procedure:

1. Open the Access Panel to gain access to the Torch

Bulkhead Panel.

2. Feed the connector on the end of the CNC Con-

trol Cable through the rubber boot on the front
panel of the Power Supply (see NOTE).

NOTE

Feed the Control Cable through the rubber boot first
as there will not be enough space inside the rubber
boot for the connector if the Coolant and Gas Leads
have been fed through the rubber boot first.

3. Connect the CNC Control Cable connector to the

Control Cable connector on the Torch Bulkhead
Panel.

4. Feed the end of the Torch Leads through the rub-

ber boot.

A-02113

Secondary

Gas

Plasma (+)

Gas

Control Cable

Connector

Coolant

Return

Coolant

Supply (-)

CNC Control

Cable

Torch Leads

Shield Stud

Shield Wire

With Ring Lug

Figure 3-16 Shielded Machine Torch Connections

5. Connect the Torch Leads Shield Wire per the fol-

lowing procedure:

a. Remove one nut and star washer from the

torch leads shield stud on the Torch Bulkhead
Panel.

Advertising