Section 4: operation, 01 introduction, 02 operating controls – Tweco PAK Master 150XL User Manual

Page 29: Section 4, Operation -1, 01 introduction -1 4.02 operating controls -1, A. front and access panel, B. control panel

Advertising
background image

Manual 0-2864

4-1

OPERATION

SECTION 4:

OPERATION

4.01 Introduction

This section provides a description of the Power Supply
operating controls and procedures. Identification of the
Front and Rear Panel components is followed by operat-
ing procedures.

4.02 Operating Controls

This subsection provides specific functional descriptions
of the Power Supply operating controls and indicators.

A. Front and Access Panel

1. Control Panel

All operator controls, except gas pressure adjust-
ment, are located on this panel and include:

• Power ON/OFF, RUN/SET and STAN-

DARD/LATCH switches

• CURRENT control

• LED indicators for AC Power, TEMP, GAS/

Coolant, and DC.

A-03047

1

2

3

4

5

Figure 4-1 Front and Access Panels

2. Access Panel

A panel to gain access to the bulkhead area con-
taining the torch connections.

3. Torch Leads Input

Rubber Boot and hole in the front panel to feed
the torch leads through to the internal bulkhead
connections.

4. Work Cable and Clamp

Work cable with clamp (factory installed).

5. Lifting Eye

Used to lift the Power Supply with cable and hook.

B. Control Panel

1. Current Control

Adjustment to set the desired output current be-
tween 30-120 amps. For drag cutting applications
set the control between 30 - 35 amps. The unit has
an automatic fold-back circuit that limits current
to 35 amps during drag cutting.

2. ON/OFF Power Switch

ON position supplies AC power to activate all sys-
tem control circuits. OFF position deactivates con-
trol circuits.

SET

SET

RUN

RUN

ON

ON

OFF

OFF

TEMP

TEMP

AC

GAS

DC

A

120

30

75

50

100

CURRENT

CURRENT

1

2

3

4

5

6

7

A-03048

8

LATCH

STANDARD

Figure 4-2 Control Panel

Advertising