06 preliminary check of the main inverter board, Preliminary check of the main inverter board -5, Transarc 130i – Tweco 130i Transarc Service Manual User Manual

Page 46

Advertising
background image

TROUBLESHOOTING 6-4 Manual 0-5282

TRANSARC 130i

6.06 Preliminary DC Bus measurement of the main inverter board

!

WARNING

Check DC bus voltage has discharged to less than 5VDC before servicing. Ensure the mains supply

plug is disconnected from receptacle.

A-11844

DC Bus Testing

Multimeter Lead Placement

Voltage with Supply voltage OFF

Upper capacitor bank

Positive meter lead to testpoint 1

Negative meter lead to testpoint 2

0 VDC

Lower capacitor bank

Positive meter lead to testpoint 2

Negative meter lead to testpoint 3

0 VDC

Table 6-2: DC BUS, Multimeter set to measure DC volts

Advertising